Southview Hydrovac
SOUTHVIEW HYDROVAC INC. · 144 North Port RD · Port Perry · GTA Ontario
Soil acceptance
Table 2 (Part XV.1, 2011)
Acceptance depends on the material and planned activity. Review the approval and confirm with the operator.
How to read these figures
Capacity figures are approval limits, not current availability. Where an approval states
only a daily limit, it is annualized; tonnes are converted at 1.5 t/m³. Always confirm
soil acceptance and available capacity with the operator before planning a haul.