GFL Environmental

GFL Environmental Inc. · 85 Vickers Rd · Toronto · GTA Ontario

437,963 m³ received (RPRA)

ECA number
5203-9CCJ5V
Approved annual rate
624,400 m³/yr
Lifetime capacity
n/a (throughput site)
Receipts recorded
2023-02 → 2026-06

Soil acceptance

Accepts non-hazardous dry soil for transfer or bioremediation; criteria depend on the process and destination.

How to read these figures Capacity figures are approval limits, not current availability. Where an approval states only a daily limit, it is annualized; tonnes are converted at 1.5 t/m³. Always confirm soil acceptance and available capacity with the operator before planning a haul.

Soil received by year (RPRA registry)

Proponent-estimated volumes from project filings naming this site as destination.

Read the approval document Get the data