← View on the map

Cherry Street Lakefill Area/Biidaasige Park North

312 Cherry Street, Toronto, Ontario, M5A 3L2 · Toronto, City of

Registry filing
N00002532
Record type
Reuse site
Estimated project volume
27,000 m³
Filed
2025-10-01
Filing status
Initial Submission

Registry details

Reuse · Residential/Parkland/Institutional/Industrial/Commercial/Community; Residential/Parkland/Institutional · Parkland/outdoor recreational

Reuse purpose

The reuse site is situated on the former Essroc and Cousins Quays, and the adjacent Cherry Street Lakefill area bounded by the realigned Don River and the Toronto Inner Harbour. The area has been infilled above lake level, with further filling required.

Reported soil quality

Table 9.1 - Full Depth, Within 30 m of Water body, Non-Potable; Table 3.1 - Full Depth, Non-Potable · Standard Tables

Registry filing party: Waterfront Toronto

Project locations, soil quality and volumes are reported by the filing party. They are not independently surveyed or verified by this explorer. A registry filing does not confirm current operation, acceptance or available capacity; confirm directly with the destination.